Lake Macquarie & Sydney · Building advice

Clear answers before you build.

Understand budgets, approval pathways, site access and what is included in your project. BMY Homes helps you plan custom homes, extensions, knockdown rebuilds, multi-dwelling projects, granny flats and modular homes around your property and priorities.

Updated 30 October 2026. Prices and timeframes below are general planning allowances, not a BMY Homes quotation or delivery commitment. Site-specific assessment, current requirements and the written scope determine your project.

How much does a custom home, extension or granny flat typically cost in Lake Macquarie or Sydney?

Costs depend on the size, specification, access and agreed inclusions. For early budgeting, broad indicative allowances are around $3,000–$6,000+ per m² for a custom home and $120,000–$250,000+ for a 40–60 m² granny flat. These are general planning guides, not BMY Homes quotes or advertised starting prices.

Land is excluded. Site works, approvals, professional reports, delivery, foundations, service connections and external works can materially increase the total; their inclusion varies between packages. Extensions and renovations need an individual assessment because structural changes and the condition of the existing home can make the affected area as costly as new construction.

  • Access, slope, soil conditions, retaining and drainage
  • Single-storey or multi-level design, floor area and structural complexity
  • Joinery, glazing, fixtures, appliances and finish selections
  • Approvals, engineering and any required specialist reports
  • Driveways, landscaping, pools and service upgrades

Confirm GST treatment and compare the same inclusions when reviewing prices. Send BMY Homes your suburb, plans and priorities for a property-specific discussion.

Custom home construction · Extensions and renovations · Granny flat designs and floor plans

How long does the process take from consultation to handover?

As a broad planning guide, allow 12–24 months from the first discussion to handover for a custom home or major residential project. A construction phase of around 6–14+ months is an indicative allowance rather than a BMY programme. Modular and granny flat projects may be quicker, depending on design, approvals, manufacture, freight and site readiness.

  1. Consultation and site review: discuss the brief, available space, access, budget and delivery options. Allow roughly 1–3 weeks for the initial stage, subject to availability and information.
  2. Concept and design: develop the layout and scope over several weeks to a few months, depending on decisions and complexity.
  3. Documentation and approvals: coordinate surveys, engineering and reports. NSW Planning advises eligible complying development approvals can be issued in as little as 20 days; preparing a complete application takes additional time. A DA can take several months or longer.
  4. Selections and contract: agree finishes, inclusions, allowances and responsibilities, sometimes alongside documentation.
  5. Construction or installation: complete the agreed works, with weather, trade availability, supply and site conditions affecting timing.
  6. Completion and handover: undertake required inspections, address outstanding items and obtain the required occupation approval before use.

BMY Homes discusses a programme for the actual project. Factory completion or a short installation period does not mean a dwelling is immediately ready to occupy.

Explore our approach or discuss your project programme.

Do I need approval for a granny flat, and what is CDC versus DA?

A new granny flat normally needs formal planning and building approval. An eligible proposal can use a Complying Development Certificate (CDC); other proposals may need a Development Application (DA) and the relevant construction approval. A block over 450 m² does not automatically qualify and does not remove the need for approval.

A CDC combines planning and construction approval for a proposal that meets the applicable standards. A council or registered certifier can assess it. A DA is assessed by the consent authority against the applicable planning controls; approval is not guaranteed.

  • Lot area: the secondary-dwelling complying development pathway generally requires at least 450 m². NSW Planning identifies an exception for a secondary dwelling wholly within an existing dwelling house.
  • Floor area: 60 m² is the usual secondary-dwelling limit under the complying development pathway. Different consent provisions or local controls may apply in other circumstances; a larger modular design is not automatically eligible as a granny flat.
  • Other controls: zoning, lot width, height, setbacks, landscaping, easements and relevant flood, bushfire, heritage or other constraints must also be checked.

If CDC is unavailable, a DA may be an option where the use is permissible. A proposal may also require other permits or approvals. BMY Homes coordinates the site information with the relevant consultants and certifier before an approval pathway is confirmed.

NSW Planning: secondary dwellings · NSW Planning: complying development

What makes a good site for a modular home, granny flat or multi-dwelling project?

A suitable site combines a permissible dwelling type with enough usable space, practical access, manageable levels and viable service connections. Modular delivery needs a workable transport and placement plan; multi-dwelling projects require a separate feasibility assessment of the proposed development.

  • Space and planning: check lot dimensions, setbacks, easements, outdoor living areas, privacy and applicable controls.
  • Access: review side access, street conditions, overhead lines, trees, turning space and potential crane setup. A completed unit cannot simply pass through a narrow gap.
  • Levels: assess slope, foundations, retaining, stormwater and drainage.
  • Services: confirm water, sewer, electricity and the location and capacity of connections.
  • Project type: duplexes and other multi-dwelling proposals have different controls from a secondary dwelling; parking and subdivision require their own assessment.

Restricted access or a sloping block does not automatically rule a project out. It can change the design, installation method, cost or approval pathway. For secondary dwellings under the Housing SEPP, additional parking is generally not required, but existing approved parking should not be removed without checking requirements.

Explore multi-dwelling construction or request a site discussion.

What is included in supply and installation compared with a full custom build?

Supply and installation provides an agreed dwelling design with the delivery and installation works listed in the written scope. A full custom build coordinates a home designed around the property and household. Neither label alone confirms every inclusion: the quote and contract define what BMY Homes will deliver.

For a granny flat or modular home, confirm the dwelling specification, freight, crane or placement arrangements, foundations, service connections, finishing, approvals and inspections. Some items may be included, optional or separately priced. Ask specifically about access works, major service upgrades, driveways, fencing and landscaping.

For custom homes, knockdown rebuilds, major extensions or multi-dwelling work, the agreed package can include design coordination, documentation, approval management, construction, selections and external works. Landscaping and pools can be coordinated where included in the agreed scope.

We discuss inclusions, exclusions, allowances, owner responsibilities and variations before proceeding, so you can compare the whole project rather than the price of the dwelling alone.

Compare granny flat and modular designs · Explore knockdown rebuilds

What are common challenges on Lake Macquarie sites, and how does BMY Homes handle them?

Slope, restricted access, drainage, service locations and planning constraints can influence Lake Macquarie projects. BMY Homes reviews these early and coordinates the design, scope and consultants around the block, helping homeowners understand the work required before committing to construction or modular supply.

  • Sloping or constrained blocks: review surveys and levels with the designer and engineer before confirming foundations, retaining or a multi-level layout.
  • Restricted access: consider delivery sequencing, equipment and crane options, including any permissions needed.
  • Existing services: assess connection locations and likely upgrades before finalising the installation scope.
  • Planning and environmental constraints: check property-specific controls and specialist reporting needs, rather than assuming the same approval pathway applies across a suburb.

We work across Coal Point, Toronto, Warners Bay, Belmont, Morisset, Wangi Wangi, Arcadia Vale and surrounding Lake Macquarie suburbs, as well as Sydney. Advice is based on the individual property; not every site in these areas has the same constraints.

Belmont, Toronto and Warners Bay · Morisset, Wyee and Cooranbong · Dora Creek

Find answers for your project.

About BMY Homes

Is BMY Homes a licensed builder in NSW?

BMY Homes publishes NSW contractor licence number 472892C. You can check the licence holder, current status and authorised categories through the official NSW licence register before engaging a builder.

How long has BMY Homes been building in Lake Macquarie and Sydney?

Our team brings more than 10 years of hands-on residential building experience. BMY Homes Pty Ltd was registered in 2024; the experience figure refers to the team, rather than the age of the company.

What services does BMY Homes provide?

We provide custom homes, knockdown rebuilds, extensions, renovations, multi-dwelling construction, and granny flat and modular home supply and installation.

Do you handle design, approvals and construction?

We coordinate design documentation, selections, approval applications and construction within the agreed scope, working with designers, engineers, certifiers and other consultants. The relevant certifier or council assesses and determines the approvals.

Which suburbs do you primarily work in?

We serve Lake Macquarie and Sydney, including Coal Point, Toronto, Warners Bay, Belmont, Morisset, Wangi Wangi, Arcadia Vale and surrounding suburbs. Contact us to discuss your property and project.

Custom Homes

Can you build from my existing plans?

Yes. Bring your plans, survey and any approvals to our first discussion. We can review the construction scope and identify the information needed for a detailed quote.

How do we keep the project within budget?

We work through the scope, inclusions and selections with you. Site conditions and design decisions affect costs, so a detailed quote is prepared for your specific project.

What approvals will we need?

The approval pathway depends on your site and proposed works. We coordinate with your designer and relevant consultants to clarify what is needed before construction.

How will changes be handled?

We discuss proposed changes and their cost and timing implications, then document agreed variations before the affected work proceeds.

How long will it take?

A broad planning allowance for a custom home or major residential project is 12–24 months from first discussion to handover, with construction often allowed 6–14+ months within that period. These are general guides, not a BMY Homes programme. Design decisions, documentation, approvals, site conditions, supply and the agreed works affect the actual timeframe.

Explore each stage from consultation to handover, then discuss a programme for your property with our team.

Can we talk before our plans are finished?

Yes. Bring your ideas, property details and any plans you have. An early discussion can help identify the next useful steps.

Can you help before I buy a block?

Yes. Share the address, proposed purchase details and any survey or planning information available. We can discuss access, levels, service connections and the further advice needed before you commit to a house design. A preliminary discussion is not a guarantee of approval or final building cost.

Can I choose between a single-storey and double-storey home?

Yes. We compare your room requirements, site footprint, outdoor space, privacy and budget. Stairs, site levels, orientation and planning controls can affect which layout is suitable.

What should I bring to the first consultation?

Bring your property address, any plans or survey, a list of rooms and features you need, your working budget and preferred timing. Photos or examples of finishes help explain your priorities.

Are site works included in a custom home quote?

The written quote should identify the agreed foundations, excavation, drainage, retaining, service connections and external works, together with allowances and exclusions. These items depend on the site and are confirmed for your project.

How much does a custom home in Lake Macquarie or Sydney cost?

For early budgeting, a broad indicative allowance is around $3,000–$6,000+ per m² for custom home construction, excluding land. This is a general planning guide, not a BMY Homes quotation or advertised starting price. Site works, approvals, external works, structural complexity and finish selections can change the total substantially.

Compare the same inclusions, exclusions, allowances and GST treatment. We prepare a property-specific proposal after reviewing your block, plans and scope. See the building cost guide and key budget variables.

Knockdown Rebuilds

Should I renovate or rebuild?

That depends on the existing structure, the changes you want and the scope of work. We can discuss both paths and the information needed to compare them before you commit.

How much will my project cost for knockdown rebuilds?

We prepare a project-specific quote based on the site, plans, scope and selections. Discuss your budget with us early so we can help you focus on the priorities that matter most.

How long will the work take for knockdown rebuilds?

For an initial planning allowance, a custom home or major project may take 12–24 months from the first discussion to handover. This is a general guide, not a BMY Homes commitment. Demolition, documentation, approvals, site preparation and construction all need to be included, along with a realistic allowance for temporary accommodation.

See the stages and timeframe variables. We discuss a programme based on your site and agreed rebuild scope.

Can I request changes for knockdown rebuilds?

Yes. We discuss the cost and timing implications of proposed changes and document agreed variations before proceeding with the affected work.

Do you coordinate demolition and disconnection of services?

We discuss demolition, service disconnections and site preparation as part of the proposed scope. Required investigations, specialist contractors, approvals and exclusions must be agreed before work starts.

Can I live in the house during a knockdown rebuild?

You will need to vacate the dwelling before demolition. Plan temporary accommodation and storage around the agreed programme, allowing for design, approvals, demolition, construction and completion requirements.

Can the new home sit in a different position on the block?

Potentially. The new footprint must be assessed against planning controls, setbacks, easements, access, drainage and the design brief. The existing house position does not automatically establish where a replacement may be built.

How do you compare a rebuild with a major renovation?

We review the existing structure, desired changes, demolition or retention requirements, site works and finishes. Comparing complete scopes and allowances is more useful than assuming one approach is always cheaper.

What should I budget for a knockdown rebuild?

Your budget needs to cover demolition and investigations, service disconnections, design and approvals, site works, construction, external works and temporary accommodation. A broad custom-home construction allowance of $3,000–$6,000+ per m² can assist early planning, but it excludes land and is not a BMY Homes price or a complete knockdown rebuild budget.

We identify the agreed inclusions, allowances and exclusions in a project-specific proposal. Check demolition, asbestos investigations, retaining, connections, driveways and landscaping rather than comparing the house price alone. Read our budget and inclusions guide.

Extensions & Renovations

Could a separate granny flat suit my needs?

A detached dwelling can be another way to add independent space. Explore our granny flat designs and talk to us about site suitability, access, delivery and approvals before choosing a direction.

How much will my project cost for extensions and renovations?

We prepare a project-specific quote based on the site, plans, scope and selections. Discuss your budget with us early so we can help you focus on the priorities that matter most.

How long will the work take for extensions and renovations?

The timeframe depends on structural complexity, the approval pathway, occupation of the home and the agreed work. A small renovation and a major structural extension need different programmes; the general 12–24 month consultation-to-handover guide for major residential projects should not be treated as the duration of every renovation.

We review design and approvals, selections, service interruptions, staging and construction before confirming a programme. Read how the project stages fit together.

Can I request changes for extensions and renovations?

Yes. We discuss the cost and timing implications of proposed changes and document agreed variations before proceeding with the affected work.

Can I stay in my home during an extension or renovation?

Sometimes, depending on the works, safety arrangements, access and whether essential rooms and services remain usable. We discuss occupancy and staging early; temporary accommodation may be needed.

How do you connect an extension to the existing house?

We consider structure, floor levels, roof junctions, drainage, waterproofing and the connection between old and new spaces. Your designer and engineer help resolve the details before construction proceeds.

What happens if hidden problems are discovered?

We explain the issue, any required investigation or specialist advice, and the effect on the work. Changes to the agreed scope, cost or programme are documented through the variation process before affected works proceed.

Can an extension include kitchen or bathroom upgrades?

Yes, where included in the agreed scope. We consider the layout, plumbing and electrical services, waterproofing, selections and sequencing together so the renovated spaces connect with the rest of the home.

How much does an extension or renovation cost?

An extension or renovation needs a property-specific quote: floor area alone cannot capture the existing structure, roof and floor connections, demolition, service changes, waterproofing and finishes. Major structural or multi-room work can approach new-build pricing for the affected area.

A clear proposal distinguishes retained work from new construction and identifies allowances for unknown conditions, exclusions and GST treatment. Site access and whether the house remains occupied also affect staging and cost. Explore the main budget variables before discussing your scope with BMY Homes.

Granny Flats & Modular Homes

How is a modular home delivered to a rear yard?

We assess access, available space and delivery options before an order is confirmed. The design, transport route, unloading position and any lifting requirements must suit the property.

Can I install a granny flat in Toronto or Coal Point?

Site suitability depends on the proposed dwelling, access, services and the relevant planning requirements. Share your property details so we can discuss the information needed for a site review.

What is included in supply and installation?

We confirm the selected design and agree the scope for supply, delivery, installation and any site works. Foundations, service connections and finishes are discussed before ordering.

How much will installation cost and how long will it take?

For early budgeting, a broad indicative allowance for a 40–60 m² granny flat is $120,000–$250,000+, with complete turnkey scopes potentially higher. This is a general planning guide, not a BMY Homes package price. Confirm whether approvals, freight, crane hire, foundations, connections, site works, finishes and GST are included.

The programme covers design and suitability checks, documentation and approvals, ordering, manufacture and freight, site preparation, installation, connections and final inspections. A short placement period is only one stage; delivery does not make the dwelling ready to occupy. We discuss the property-specific cost and programme before ordering.

Read the budget guide · Understand the complete project stages

Does a block larger than 450 square metres automatically avoid council approval?

No. Land area alone does not establish approval eligibility. Zoning, dwelling size, setbacks, site constraints and other requirements must be checked. An eligible proposal may use a complying development pathway, but this still requires the appropriate certification.

Can a modular home be installed behind an existing house?

Potentially. We assess the delivery route, side access, overhead obstructions, unloading position and any crane or lifting requirements. Access through a neighbouring property requires the relevant permission and arrangements; it cannot be assumed.

Do I need foundations and water, sewer and electricity connections?

The dwelling needs a suitable foundation system and the services required for its approved use. Engineering, ground conditions, available connections and connection distances affect the scope. We identify the agreed works, allowances and exclusions in the proposal.

Can a foldable home be occupied immediately after delivery?

Delivery or unfolding does not by itself make a home ready to occupy. Installation, service connections, finishing work, inspections and any required completion or occupation documentation must be addressed.

Can I change the floor plan, finishes or inclusions?

Ask before ordering. Available options depend on the model and supplier specifications, as well as engineering and approval requirements. Confirm the final layout, materials and inclusions in writing before committing.

Are the catalogue images and floor plans the final specification?

They illustrate available designs and example finishes. Confirm the current floor plan, dimensions, inclusions, availability and site suitability with us before ordering. Where a floor plan is not yet confirmed, request the current layout.

What information do you need to assess my property?

Send the address, intended use, preferred model, photos of the driveway and side access, and any survey or site plan. Tell us about known easements, slopes, existing services and delivery restrictions.

Do you provide a fixed package price for every property?

No single price suits every site. The selected dwelling, transport, lifting, foundations, connections, approvals and finishing works affect the total. Request a written, property-specific scope and quote.

What is the difference between CDC and DA approval?

A Complying Development Certificate (CDC) is a combined planning and construction approval for a proposal that meets all applicable standards. A Development Application (DA) is assessed by council on its merits; further construction approval is generally needed before building. We coordinate the appropriate documentation with your consultants and certifier.

What is the usual maximum size of a granny flat in NSW?

The Housing SEPP generally limits a secondary dwelling to 60 m² of total floor area. A larger area may be permitted under another applicable planning instrument on the consent pathway. Complying development has its own standards, so a larger catalogue model must not be assumed to qualify as a granny flat.

What makes a suitable site for a modular granny flat?

A suitable site needs a permissible use, adequate space and setbacks, workable access and lifting arrangements, appropriate foundations and service connections. We also check the information needed about easements, drainage, trees, flooding, bushfire and other planning constraints before the design is confirmed.

What happens between consultation and handover?

We first review your brief and property, then confirm the design and feasibility, documentation and approvals, written scope and ordering. Manufacture and freight are coordinated with site preparation, followed by installation, connections, finishing, inspections and handover. Each stage has its own dependencies; delivery time alone is not the full programme.

New Homes in Lake Macquarie

Can you help plan a home for a sloping or narrow block?

Send the site plan, survey and any reports you have. Block width, levels, vehicle access, orientation and drainage need to be reviewed together before a layout is selected. We discuss what further design or engineering information is needed for your property.

Can I change the floor plan or finishes?

Tell us what you want to change during the design brief. We review layout options, finishes and their effect on the scope and budget. Changes during construction need a written variation covering the work, price and any impact on the programme before proceeding.

What should a new home estimate include?

Ask for the dwelling, site works, foundations, service connections, finishes and external works to be identified, together with allowances and exclusions. A clear specification makes proposals easier to compare than a headline price alone.

Can you review a block before I purchase it?

Share the address and available survey, plans or reports. We can discuss access, levels, services and the further consultant advice needed to assess your preferred home. Final feasibility and costs require the relevant site information.

Do you build from existing architectural plans?

Yes. Send your plans, approvals and specifications so we can review the construction scope and identify any additional documentation needed for a detailed estimate.

How are site costs and allowances handled?

Your proposal should distinguish the house from site preparation, foundations, drainage, retaining and service connections. Allowances and exclusions need to be clear before you compare quotes or finalise your budget.

Planning a Granny Flat in Lake Macquarie

Do you supply and install modular granny flats?

Yes. BMY Homes coordinates supply, delivery and installation for the selected design. We review access and site requirements first, then define the foundations, connections and finishing works in the project scope. Browse the design catalogue to compare the available layouts.

What is the difference between a granny flat and a modular home?

A granny flat describes a dwelling’s intended role on a property. Modular or foldable describes how a building is manufactured and assembled. A catalogue model’s size and layout still need to be assessed against the intended use, site and approval requirements.

Can a granny flat be ready within a week?

Assembly time is only one stage. The complete programme also includes design confirmation, approvals, manufacture, transport, site preparation, connections and completion requirements. Ask for a timeline covering the whole project for your selected model and property.

Can a modular dwelling be delivered to a backyard with limited access?

Delivery feasibility depends on the selected design, transport route, access width, overhead obstructions and unloading or lifting options. We review the property before confirming an order or installation method.

Does owning a block over 450 square metres remove approval requirements?

No. Block size alone does not determine eligibility. The design, zoning, setbacks and site constraints need to be assessed, and an eligible complying development proposal still needs appropriate certification.

What should I send with my granny flat enquiry?

Send the address, intended use, preferred model and photos of the driveway, side access and proposed location. Include any survey, service information or planning reports already available.

Duplexes & Multi-Dwelling Projects

Can any block accommodate multiple dwellings?

No. Feasibility depends on the site and applicable planning controls. We start with the property information and work with the relevant consultants before making commitments about what can be built.

How much will my project cost for multi-dwelling projects?

A duplex or multi-dwelling project needs a feasibility review and a quote for the complete development. The dwelling count, planning pathway, design, demolition, site works, drainage, service capacity, parking, landscaping and any subdivision scope can all affect the budget.

A single-house square-metre guide is not a reliable complete development price. We identify inclusions, allowances, exclusions and responsibilities in a project-specific proposal. Explore key budget variables and compare what is included.

How long will the work take for multi-dwelling projects?

Multi-dwelling timing depends on feasibility, design, approvals, services, construction staging and any subdivision requirements. The general 12–24 month guide for major residential projects is an initial planning reference, not a promise; complex approvals or development infrastructure can extend it.

We discuss the dependencies and programme for the proposed development rather than applying a single-home timeframe to every project. Read the project stage guide.

Can I request changes for multi-dwelling projects?

Yes. We discuss the cost and timing implications of proposed changes and document agreed variations before proceeding with the affected work.

Can you tell me whether a duplex is allowed on my property?

We can discuss the information needed for a feasibility review with the relevant planning consultants. Zoning, lot dimensions, access, constraints and current controls must be checked before confirming development potential.

Do you coordinate separate services and access for each dwelling?

We consider vehicle and pedestrian access, privacy, drainage and service connections alongside the designers and consultants. The approved design and written scope determine the works included for each dwelling.

Is subdivision included in multi-dwelling construction?

Construction and subdivision are separate processes. Tell us your intended ownership structure early so the appropriate consultants can assess requirements. Subdivision work and fees are included only where expressly agreed.

Can each dwelling have different layouts or finishes?

Yes, subject to the design, approvals and agreed scope. We review each dwelling’s intended use, room requirements, selections and budget, and document the inclusions before construction.

What makes a good site for a duplex or multi-dwelling project?

Start with planning permissibility, lot dimensions, access, setbacks, easements, drainage and service capacity. Then assess how each dwelling will receive light, privacy, parking and outdoor space. A planning and site-feasibility review should come before a fixed layout or construction commitment.